BLACK FRIDAY SALE! UP TO 50% OFF ALL EXAM PREP PRODUCTS! | PASS YOUR EXAM CONFIDENTLY, ON YOUR FIRST TRY!
BLACK FRIDAY SALE! UP TO 50% OFF ALL EXAM PREP PRODUCTS! | PASS YOUR EXAM CONFIDENTLY, ON YOUR FIRST TRY!
Add description, images, menus and links to your mega menu
A column with no settings can be used as a spacer
Link to your collections, sales and even external links
Add up to five columns
Add description, images, menus and links to your mega menu
A column with no settings can be used as a spacer
Link to your collections, sales and even external links
Add up to five columns
A. Togay Koralturk
Last updated on November 25, 2026
12 min read

On most engineering teams, only a few people are allowed to put their seal on the drawings, and every bridge, treatment plant, and building frame waits for one of them. An engineering degree does not grant that authority, and a job title does not either. It comes from a PE license, which a state issues only after it has checked an engineer's education, examinations, and years of practice. This guide explains what a PE license is, the steps to earn one, and how the requirements differ from state to state.
On this page
A professional engineer (PE) is an engineer who holds a license from a state licensing board. The PE license is that credential. It authorizes the holder to offer engineering services to the public and to prepare, sign, and seal engineering drawings, and it is valid only in the state that issued it.
The title is protected by law, which is the difference between a professional engineer and an engineer in the everyday sense. A graduate who designs products for an employer is doing engineering work, but only a licensed engineer may take legal responsibility for a design that is submitted to a public authority. Licensed engineers show this by writing P.E. after their names.
Engineering is licensed for the same reason that medicine and law are. The public cannot judge whether a retaining wall or an electrical system has been designed safely, so the state verifies the designer instead. The first licensure law of this kind in the United States was enacted in Wyoming in 1907, and today every state and territory regulates the profession through a board of its own.
Two organizations appear throughout the process, and it helps to separate their roles from the start:
In other words, NCEES tests you and your board licenses you. NCEES counted more than one million licensed Professional Engineers in the United States in 2025.
To get a PE license, earn a bachelor's degree from an accredited engineering program, pass the Fundamentals of Engineering (FE) exam, gain four years of progressive engineering experience under a licensed engineer, and pass the Principles and Practice of Engineering (PE) exam. You then apply to your state licensing board, which issues the license.
The steps normally happen in this order:
The application to the board is sometimes counted as a fifth step, and it is the one that produces the license. Passing the PE exam does not make you a Professional Engineer by itself, because the board still has to confirm your experience and your references.
The order of the last two steps is not the same everywhere. Some boards, including those of Texas and Florida, allow candidates to take the PE exam before the four years are complete, and the license is then issued when the experience has been earned. Our article on PE exam requirements explains who may sit for the exam and when.
Ready to earn your LEED credential?
200,000+ Learners and Counting

PE Civil Water Resources and Environmental Practice Exams
Start Your Prep →PE Civil Water Resources and Environmental Practice Exams →The PE license requirements in most states are a bachelor's degree from an EAC/ABET-accredited engineering program, passing results on the FE and PE exams, and four years of acceptable, progressive, and verifiable work experience. Many states offer alternative paths for other degrees, usually in exchange for additional years of experience.
The table below sets out the standard requirement and the most common alternatives:
| PE license requirement | The standard in most states | Common alternatives |
|---|---|---|
| Education | Bachelor's degree from an EAC/ABET-accredited engineering program | Engineering technology, non-accredited, and foreign degrees, with more experience or a credentials evaluation |
| FE exam | A passing result | A waiver in some states for engineers with long experience |
| Experience | Four years of progressive work verified by a licensed engineer | Credit for a graduate degree in some states |
| PE exam | A passing result in one discipline | State-specific exams added in some states |
Two examples show how much the alternatives can change the path. Texas requires four years of experience from an applicant with an accredited degree and eight years from an applicant whose degree is not accredited. Florida requires 48 months with a bachelor's degree in engineering and 72 months with a bachelor's degree in engineering technology.
Graduates of universities outside the United States usually start with an evaluation of their degree. NCEES offers a Credentials Evaluations service for this purpose, which compares a foreign degree with the accreditation standard for a fee of $400, and many boards accept its report.
Because the alternatives differ so widely, read your own board's rule before you plan around one. This applies above all to a candidate who hopes to qualify without an engineering degree. Florida, for example, accepts only an accredited engineering or engineering technology degree, or a degree that has been evaluated as substantially equivalent to one.
Qualifying experience is engineering work that is progressive, meaning that it grows in complexity and responsibility, and verifiable, meaning that a licensed Professional Engineer or a similarly qualified supervisor can confirm it. Most states require four years of it, counted from graduation, before they will issue a license.
Boards read these two words carefully. Progressive experience shows a change over time. Consider an engineer who spends the first year checking pipe quantities on drawings, the second year sizing the pipes under supervision, and the fourth year designing a pump station and presenting it to the client. That record shows growing judgment, which is what the board is looking for. Four years spent repeating the first year's task would not show it.
Verifiable experience is confirmed by other people. Your supervisors and references describe your work to the board directly, so the engineers who can vouch for you matter as much as the projects themselves.
Several details of the count differ from board to board:
The practical lesson is to keep a record from your first week. Write down each project, your role, the dates, and the name and license number of the engineer who supervised you. Engineers change employers and supervisors retire, and a record made at the time is far easier to verify than one rebuilt four years later.
You apply for a PE license to the licensing board of the state where you intend to practice. The application documents your degree, your exam results, your experience, and your references, and many boards add a state-specific exam on engineering law and ethics. The board reviews the file and issues the license.
The same documents appear in nearly every application, although the numbers change. The table below compares four boards, using the figures on their own websites:
| State board | Experience with an accredited engineering degree | References | State-specific exam |
|---|---|---|---|
| Texas | 4 years | 3 licensed PEs | Texas Ethics of Engineering exam, open book |
| Florida | 48 months | 3 licensed PEs | Laws and Rules Study Guide, passed at 90% or higher |
| Pennsylvania | 4 years | 5 references, of whom 3 are licensed PEs | None listed in the board's guide |
| California | Set by state law and regulation | Work-experience references, or an NCEES Record in their place | Civil Seismic Principles and Civil Engineering Surveying exams, for civil engineers |
A few points from these boards are worth knowing before you begin:
The best preparation is to open your board's application long before you need it. You will then know how many references to cultivate, which of them must be licensed, and whether a state exam is waiting at the end.
A PE license costs $625 in national exam fees, plus a state application fee that differs by board. The FE exam fee is $225 and the PE exam fee is $400, both paid to NCEES. With a board fee of $75 in Texas or $230 in Florida, the required total comes to $700 or $855.
The table below lists the fees, with two boards as examples of the state portion:
| PE license cost | Amount | Paid to |
|---|---|---|
| FE exam fee | $225 | NCEES |
| PE exam fee | $400 for most disciplines | NCEES |
| State application fee, Texas | $75 | Texas board |
| State application fee, Florida | $230, including the initial license | Florida board |
| Credentials evaluation, for degrees from outside the United States | $400 | NCEES |
The exam fees are current as of the November 2026 NCEES Examinee Guide, and the board fees are the amounts published by each board in November 2026. One exception applies to structural engineers: the PE Structural exam is taken in components that cost $350 each.
Some boards also charge for the Engineer in Training certificate along the way, and Florida's fee for it is $100. Some employers reimburse exam and license fees for their engineers, so ask before you pay. Our articles on FE exam cost and PE exam cost add the rescheduling fees and retake costs to this budget.
In most states, a PE license takes at least four years after graduation, because that is the qualifying experience the boards require. Counting a four-year engineering degree, the whole path takes about eight years, with the two exams taken along the way.
The experience requirement sets the pace, since neither exam takes more than a day and results arrive within 7 to 10 days. A candidate who passes the FE exam before graduation and logs experience from the first job reaches the application as early as the rules allow.
Several things can lengthen or shorten that period, including the type of degree, credit for a graduate degree, and whether the board lets you take the PE exam early. Our PE license timeline follows the path stage by stage.
A PE license does not last indefinitely. It must be renewed with the state board on a schedule that the state sets, such as every year in Texas and every two years in Florida, and boards commonly require continuing education hours for each renewal.
Continuing education means courses, seminars, and similar activities that keep an engineer's knowledge current, and boards usually measure it in hours. Two boards illustrate the range:
| State board | Renewal period | Continuing education required | Renewal fee |
|---|---|---|---|
| Texas | Every year | 15 hours for each renewal cycle, including at least 1 hour of ethics | $50 |
| Florida | Every two years | 18 hours, including 1 hour of Florida laws and rules, 1 hour of ethics, and 4 hours in the area of practice | $98.75 |
An engineer who is licensed in several states has to meet each state's requirement separately, so keep the certificate from every course you complete.
The Engineer in Training certificate follows different rules. In Florida it is a certification that never has to be renewed, while in Texas it is valid for eight years and can be renewed on request.
A PE license does not transfer automatically between states. To practice in a second state, a licensed engineer applies to that state's board, which reviews the education, exams, and experience behind the original license. This process is called comity or endorsement, and it does not require taking the national exams again.
The term reciprocity is common in conversation, but most boards do not use it. Florida, for instance, states that it does not license by reciprocity or comity and that it licenses by endorsement, which means it evaluates each applicant against its own requirements. Pennsylvania grants a license by comity when the requirements of the first state were equal to its own.
The national exams make this workable. Because every board uses the same FE and PE exams, a passing result earned in one state is recognized in the others. What remains is paperwork, and that is where the NCEES Record helps.
An NCEES Record is a verified file of your transcripts, exam results, experience, and references, which NCEES holds and sends to any board you choose. The details below come from the NCEES Records program:
Some state requirements still apply to every newcomer. An engineer who moves to California to practice civil engineering takes the state's seismic and surveying exams, and one who moves to Florida completes its laws and rules study guide.
If you are at the start of this path, the two exams are the part you can prepare for today. Our FE practice exams and PE practice exams follow the NCEES specifications in the same format as the actual exams.
Ready to earn your LEED credential?
200,000+ Learners and Counting

PE Civil Water Resources and Environmental Practice Exams
Start Your Prep →PE Civil Water Resources and Environmental Practice Exams →A professional engineer is an engineer who holds a license from a state licensing board. The license authorizes the engineer to offer engineering services to the public and to sign and seal engineering drawings, and it is earned through an accredited degree, two national exams, and four years of experience in most states.
PE stands for Professional Engineer. It is the title of an engineer who holds a license from a state licensing board, and licensed engineers write it after their names as P.E.
Earn a bachelor's degree from an accredited engineering program, pass the FE exam, gain four years of progressive engineering experience under a licensed engineer, and pass the PE exam. You then apply to your state licensing board, which reviews your record and issues the license.
The path is long more than it is obscure. It takes at least four years of experience after graduation in most states, and the PE exam is demanding: first-time pass rates for the five PE Civil exams ranged from 55% to 68% in the NCEES figures published in January 2026.
A PE license allows you to offer engineering services to the public and to prepare, sign, seal, and submit engineering drawings. In practice, it lets you take legal responsibility for a design, which many senior roles in consulting and public works require.
The national exam fees are $225 for the FE exam and $400 for the PE exam, both paid to NCEES. Each state board adds its own application fee, such as $75 in Texas and $230 in Florida. Study materials and renewal fees are extra.
Yes. A PE license must be renewed on a schedule set by the state, and boards commonly require continuing education for each renewal. Texas, for example, renews annually with 15 hours, and Florida renews every two years with 18 hours.
Not automatically. You apply to the new state's board for a license by comity or endorsement, and the board reviews the record behind your first license. You do not retake the FE or PE exam, although some states add their own exams.
It depends on the state. Some boards license applicants with engineering technology or non-accredited degrees after additional years of experience, as Texas does with eight years. Check your board's rule before you plan on an alternative path.

A. Togay Koralturk November 25, 2026 9 min read
How long does it take to get a PE license? See the FE to EIT to PE timeline stage by stage, the experience years, and what can shorten or delay the path.

A. Togay Koralturk November 25, 2026 10 min read
What is EIT certification? How to become an Engineer in Training: FE exam requirements, state board steps, costs, salary impact, and the path to your PE.
A. Togay Koralturk is a globally recognized pioneer and educator in sustainable design and construction, as well as an international best-selling author of LEED study guides. His LEED publications have reached tens of thousands of professionals worldwide and have been widely adopted as primary course materials at leading universities across the United States. Holding a bachelor’s degree in civil engineering and a master’s degree in construction management from the University of Southern California, he began his career in Los Angeles, CA, earning his LEED AP® credential along the way in 2008. He has helped numerous projects pursue LEED certification worldwide and has educated thousands of professionals.